Perth ConstructionEstimating
Civil construction kerbing and drainage works on a Perth subdivision

Civil Estimating Perth

Drainage, kerbing, road base, pavement and civil works quantities for Perth local government and commercial civil projects. WA supply rates and local authority specifications applied.

  • 18+ years experience
  • First estimate free
  • 24hr turnaround
  • No lock-in contract

Priced to WA Authority Specs

Civil works estimating in WA requires knowledge of local authority specifications, current WA plant rates and the specific material standards that apply to roads and drainage in the Perth metropolitan area. An estimate built on interstate civil rates or generic national specifications will be wrong on a Perth local government job.

We estimate civil works for Perth civil contractors, covering road construction, stormwater drainage, kerb and gutter, footpath and shared-path construction, carpark development and subdivision civil works. WA rates, local specifications, properly measured quantities.

Civil road drawing showing a pavement cross-section with a scale rule and dividers resting on it

Civil Works We Estimate in Perth

Civil ElementWhat We MeasureWA-Specific Notes
Road base and subbasem3 by compacted depth and areaMRWA or local authority specification applied
Asphaltic concreteTonnes by compacted depth and m2Mix type by traffic loading classification
Kerb and gutterLM by kerb type, standard, barrier, roll-topMRWA or local authority standard drawings
Stormwater drainageLM of pipe by diameter, pit item countsWSUD requirements for post-2012 Perth subdivisions
Footpath and shared pathsm2 by width and surface typeDPI and ARUP path standards for cycling routes
CulvertsItem by type, size and inlet/outlet treatmentInlet protection and headwall included
Line markingLM by line type and widthRetroreflective vs standard specification
Street furniture and signsItem count by typeAS 1742 specification references
Civil estimating elements for a Perth local government or commercial civil project. Specification references vary by authority, City of Perth, MRWA, Waterway WA and local government authorities have different standard drawings.

WA Civil Engineering Standards

Civil works in Perth must comply with MRWA (Main Roads WA) specifications for road construction, and individual local government authority standard drawings for drainage, kerbing and footpaths. Standards differ between City of Swan, City of Joondalup, City of Fremantle and others. We reference the correct authority specification for each project before any quantity is priced.

Every Layer Is a Separate Number

A road is not one item. It is a stack of layers, each with its own compacted thickness, its own material rate and its own compaction and testing requirement.

Price the pavement as a single square metre rate and the first thing that moves on site, a deeper subgrade box, an extra base layer, a change in mix type, has nowhere to go except your margin.

What We Separate Out

  • Subgrade box out and spoil disposal volumes
  • Geotextile area where sand subgrade needs it
  • Subbase and base course by compacted depth
  • Asphalt tonnage by mix type and compacted thickness
  • Kerb by profile and linear metre
  • Drainage pipe by diameter, plus pit and lintel counts
  • Compaction testing and proof roll hold points
  • Traffic management and staging where the road stays live
Freshly poured concrete kerb and gutter beside compacted road base on a new residential road
Kerb is measured in linear metres by profile. Get the profile wrong against the authority standard drawing and the whole run gets repriced.

m3

Earthworks volumes

Cut, fill and box out

MRWA

Specifications applied

Plus local authority drawings

Tonne

Asphalt measured

By mix and compacted depth

Free

First job

No lock-in contract

Smooth drum roller compacting crushed limestone base course along a new road corridor

The Specification Decides the Price

Two councils can want the same looking road and specify it completely differently. Different base depth, different mix, different kerb profile, different testing frequency.

That is the part interstate rate cards and generic estimating software cannot carry. The quantity is only half the answer, the specification behind it is what turns the quantity into a real cost.

We check which authority the job sits under and price it to that standard drawing before anything else happens. If the documents are silent, we tell you what we have assumed instead of hiding it in a rate.

Road Construction Estimating

Road construction in Perth typically involves subgrade preparation, geotextile fabric in problematic sand areas, granular subbase, road base, and asphaltic concrete surface course. Each layer has a compacted thickness specification and a different material rate.

  • Subgrade preparation: scarify, compact and proof roll
  • Geotextile fabric supply and installation
  • Granular subbase: crushed limestone or CMDG by specification
  • Road base: CMDG20 or DG40 to MRWA specification
  • Asphaltic concrete: AC10 or AC14 surface course by traffic loading
  • Primerseal or primecoat to MRWA specification
  • Heavy duty pavement for industrial hardstands

m3

Pavement layers

By specification

LM

Kerb and drainage

Authority standard

MRWA

Standards applied

And local authority

WA

Current plant rates

Perth market

Stormwater Drainage Estimating

Stormwater drainage estimating involves pipe quantities by diameter, pit item counts by type, trench excavation volumes, bedding and backfill quantities, and all the connections, bends and junctions in the drainage system. Each of those items is a real cost on a civil job.

  1. 01

    Civil Drawings Received

    Road design plans, drainage design, utility plans and any local authority or MRWA specification applicable to the project.

  2. 02

    Quantities Calculated

    Pavement areas and volumes, drainage pipe lengths, pit counts, kerb runs and footpath areas measured from calibrated drawings.

  3. 03

    Specification Referenced

    MRWA or local authority specification applied to each element. Variation from standard specification noted as a cost difference.

  4. 04

    WA Rates Applied

    Current Perth plant hire, material supply and labour rates applied. WA-specific rates for asphaltic concrete, crushed limestone and drainage materials.

  5. 05

    Estimate Delivered

    Structured by element type (earthworks, pavement, drainage, kerbing and footpath) so you can compare subcontractor prices on each package.

Common Questions

Straight answers on how we price civil estimating in Perth. If yours is not here, send your plans and just ask.

Yes. Subdivision civil works are a common estimating package, covering lot clearing, earthworks, roads, drainage, kerbing, footpaths, reticulation trenching and service conduits. We can estimate the full civil scope or individual trade packages.

Yes. Road works within the MRWA network, or works adopting MRWA specifications, are estimated with reference to the current MRWA specification suite and standard drawings. Local government works reference the relevant local authority specifications.

Yes. Carpark civil works include earthworks, subbase, road base and asphaltic concrete or concrete pavement, drainage, kerbing, line marking and signage, all estimated as a complete scope or by trade package.

Yes. On commercial developments that include both building works and site civil, we can estimate the civil and building trades together. Civil packages typically include earthworks, pavements, drainage and services infrastructure.

Get Your First Estimate Free

Send us your plans and we will take it from there. First job is on us, 24-hour turnaround on most residential jobs, and no lock-in contract.

18+ years experience·24-hour turnaround on most residential jobs·First job free