Drawings Turned Into a Priceable List
A bill of quantities is the document that turns a set of drawings into a priceable list of work items. Done properly, it removes ambiguity from a tender process and gives subbies something concrete to price against. Done poorly, vague descriptions, wrong quantities, missing items, it produces scattered quotes that cannot be compared and a tender number you cannot trust.
We produce quantity takeoffs and bills of quantities for Perth builders, project managers and quantity surveyors. Multi-trade or single-trade, colour-coded plan markup included, structured for direct subcontractor pricing.

What We Include in a Bill of Quantities
We break your project into individual work items, set the unit of measurement, provide the quantity, and leave a rate column for pricing. The format is standardised so your subbies know exactly what they are quoting.
| BoQ Section | What Is Included | Format |
|---|---|---|
| Preliminaries | Site establishment, OH&P, project-specific items | Item or % allowance |
| Earthworks | Excavation, fill, disposal by m3 | m3 by material type |
| Concrete | Volume by element, reo by kg, formwork by m2 | Structured by structural element |
| Masonry | Brick and block by m2, mortar, ties | By wall type and location |
| Structural steel | Tonnage by section and grade | From structural drawings |
| Carpentry and joinery | Framing LM, doors and windows by item | By type and location |
| Finishes | Plastering, painting, tiling, flooring by m2 | By room and surface |
| Services (PC sums) | Electrical, plumbing, mechanical, prime costs | PC sum where subcontractor not yet selected |
What Is a Bill of Quantities?
A bill of quantities is a structured document that lists all the items of work in a construction project, specifies the unit of measurement and provides the quantity of each item. It allows subbies and suppliers to insert their rate against a defined scope, producing a tender sum that can be checked, compared and negotiated. A Perth BoQ follows Australian measurement conventions and references the relevant WA supply and authority standards.
Measured, Not Estimated
A bill of quantities is only worth having if every line in it can be traced back to something on the drawing. Otherwise it is a list of guesses in a tidy format.
So we measure. Scale is checked against a known dimension before anything is counted, and anything that does not agree between the architectural and structural set gets queried rather than averaged.
How a Line Item Earns Its Place
- Scale verified against a stated dimension on the sheet
- Each item measured in its correct unit, m2, m3, LM or item
- Openings and deductions applied, not ignored
- Waste and lap allowances stated, never buried in a rate
- Provisional sums flagged where information is missing
- Drawing revision recorded against the takeoff
- Conflicts between drawing sets raised as an RFI
- A colour-coded markup so you can audit every figure

BoQ
Structured document
Ready to send to subbies
Rev
Revision tracked
Against the drawing set
24hr
Turnaround
Straightforward jobs
Free
First job
No lock-in contract

One Document Everybody Prices Against
When five subbies price a job off five different readings of the same drawings, you are not comparing prices. You are comparing interpretations, and the cheapest one is usually the one that missed something.
A bill of quantities removes that. Everyone prices the same scope, in the same units, in the same order, so the difference between two submissions is genuinely rate and not scope.
It also gives you the reference document you will need later, when a variation lands or a progress claim needs to be justified against what was actually agreed.
Colour-Coded Plan Markup on Every Package
Every quantity takeoff we produce includes a colour-coded PDF markup of the plans. Each trade element is a different colour, labelled with the BoQ item reference so subbies can cross-check the quantity against the drawing.
This makes disputes over quantities much easier to resolve. If a bricklayer thinks the wall count is wrong, they can check the markup directly rather than re-measuring from scratch.
Single-Trade vs Multi-Trade Takeoffs
We can produce a takeoff for a single trade, just the concrete, just the brickwork or just the painting, or a full multi-trade BoQ covering the entire project. Single-trade takeoffs are useful when you have one trade to price urgently; multi-trade BoQs are better for a full tender submission.
Colour markup
Every takeoff included
Excel
BoQ spreadsheet
Ready for pricing
All
Trades covered
Single or multi-trade
WA
Standard references
Australian conventions
When Do You Need a Bill of Quantities?
- Before sending a project to tender: gives subbies a common document to price
- When comparing multiple subcontractor quotes on the same scope
- When the client asks for a fixed-price contract rather than a schedule of rates
- When a project has complex trades that need to be separated for subcontractor packaging
- When a government or institutional client requires a formal BoQ as part of their tender process
- When preparing a progress claim or variation: the original BoQ is the reference
First Takeoff Free
Your first quantity takeoff and bill of quantities is free. After that, pricing is a fixed fee agreed before we start. Send us the drawings and we will confirm what is involved and what it costs.
- 01
Drawings and Specification Received
Architectural, structural and services drawings. Specification documents and any existing BoQ template the client requires.
- 02
Trade Packages Confirmed
We confirm which trades are to be included and the required level of detail for each package.
- 03
Takeoff Completed
All quantities measured from calibrated plans. Colour-coded markup produced for each trade.
- 04
BoQ Compiled
Quantities structured by trade section in the agreed format. Descriptions written to Australian convention.
- 05
Delivered for Pricing
Colour markup PDF and BoQ spreadsheet delivered. Ready to send to subbies for pricing.
Common Questions
Straight answers on how we price quantity takeoff and bill of quantities in Perth. If yours is not here, send your plans and just ask.
A quantity takeoff is the measurement process, extracting and calculating quantities from drawings. A bill of quantities is the document that presents those quantities in a structured format for pricing. We produce both, and the takeoff is always done first, the BoQ is built from the takeoff data.
Yes. Our BoQs follow AS 1181 conventions for measurement and description. This is the accepted standard for Australian construction tender documents.
Yes. If the client or authority has a required format or template, send it to us with the drawings. We will produce the BoQ in that format.
Yes. A BoQ produced at tender stage is a reference document for progress claims during construction. Quantities measured and certified against the original BoQ are the basis for monthly claim certification.