A Rate Per Point Prices The Easy Half

Quoting at so much per point works fine right up until a job stops being average. The number says nothing about how far it is back to the board, whether the wall has to be chased, or a spec that steps the cable size up on half the circuits.

So we do both jobs. The points get counted and typed, and every circuit is walked out on the drawing with its own length, cable size and protection.

Send us the electrical plan and the specification. First estimate is free, so you can check our count against your own before you spend anything.

Open residential switchboard with two rows of circuit breakers on din rail and the cabling dressed in below them

What We Do on an Electrical Job

We take off and price the electrical on your job so you can quote it without carrying the risk yourself. Points, cable, the switchboard and the sub-mains, all measured off your drawings and priced on current WA supply and labour rates.

You send the electrical plan and the specification, we send back a colour-coded markup and a live spreadsheet, usually inside 24 hours on residential work. Each point and each circuit sits on its own line, so you can see where the total comes from before you put it in front of a client.

It is the same work whether you are a sparkie pricing your own jobs, a builder who needs the electrical trade priced inside a full tender, or a homeowner trying to work out whether the quote in front of you is fair.

Residential electrical floor plan marked up by hand, outlet symbols ringed in highlighter and cable routes traced along the walls
The plan comes back marked up. Every symbol we counted and every run we measured is on it, so the number can be checked against the drawing.

What We Cover in an Electrical Estimate

Nothing on the sheet is an allowance. Each line comes off the drawing in the unit that part of the trade is actually bought and paid in, so you can lay the estimate beside the plan and check it.

ItemHow We MeasureWhy It Matters
Power pointsCounted and typed: single, double, weatherproof, appliance-dedicatedA weatherproof outlet or an appliance circuit costs nothing like a standard double
Light pointsCounted by fitting type with the switching arrangement written downEvery extra switch position on a light adds cable that a bare point count misses
Cable runsMeasured in metres, by size, along the route the pull will really takeScaled straight across the page, every run in the building comes up short
CircuitsOne line each, with the cable size and the protective deviceHow many circuits there are sets how big the board has to be and what goes in it
SwitchboardListed device by device, down to the enclosure it all fits insideOn a renovation the board is regularly the biggest single number on the page
Sub-mainsLength and size, plus the trench or conduit that has to carry themA shed, studio or granny flat is priced by how far away it sits, not by what is in it
Data and commsOutlet count and run lengths, kept in a package of their ownClients settle the data scope late and want to see it on its own before they do
Solar, battery and EVArray and inverter locations, the DC and AC runs, isolation pointsRarely drawn on the original electrical plan, and rarely a small number
Standard scope for a Perth residential electrical estimate. Commercial work adds emergency and exit lighting, mechanical services power and fire system interfaces.

What Is Included in an Electrical Estimate?

A Perth electrical estimate covers the point count by type, the cable schedule by circuit with sizes and route lengths, the switchboard schedule, sub-mains, and separate packages for data, security and solar. Labour is applied per point and per metre against current WA rates, with an access allowance where the install is in existing fabric.

Unlined room in a Perth house at rough-in stage with cable run along the roof framing and dropped down the brickwork to outlet boxes

How We Take Off an Electrical Job

Every job runs the same path from drawings to priced spreadsheet. Nothing is scaled off a phone photo, and no part of the total is a round allowance dropped in to cover a gap.

  1. 01

    Send Us Your Plans

    Electrical plan, the architectural set and the specification. Photos of a marked-up set are fine if that is what you have, and we tell you what is missing before we start.

  2. 02

    Calibrate the Scale

    Every drawing is calibrated against its own title block before a length is taken. PDFs print a couple of percent out, and on cable that error runs through every circuit on the job.

  3. 03

    Count and Type the Points

    Points are counted, typed and grouped room by room, so checking the count against the drawing takes a few minutes and not an evening.

  4. 04

    Measure the Circuits

    Each circuit is walked out on the plan and measured by size, with sub-mains, trenching and conduit on lines of their own.

  5. 05

    Schedule the Board

    The board is written out device by device, down to the enclosure it all has to fit inside, plus any change the consumer mains need.

  6. 06

    Cross-Check and Deliver

    A second pass reconciles the point count against the circuit schedule before it goes out. You get a colour-coded markup and a live spreadsheet, usually within 24 hours on residential jobs.

Why The Job Gets Measured Twice

The first pass reads the drawing and produces the count. The second reads the count back against the circuit schedule and the board, looking for the point that was drawn and never priced, and the run that was picked up twice under two different names.

That second pass is where most of the errors get caught, and it is the reason a query list comes back with the estimate rather than a set of quiet assumptions.

Cable, Circuits And What Moves The Size

Two houses with an identical point count can carry very different cable bills. What moves it is how far each run goes, what it feeds, and how far the specification splits the circuits up.

CircuitWhat It FeedsWhat Moves The Cost
LightingLight points, switching and any dimmingSwitch positions per light, and whether the client wants the house zoned
General powerStandard single and double outletsHow many separate circuits the specification splits the house into
Dedicated applianceOven, cooktop, dishwasher and laundryOne circuit each, and each one is its own run back to the board
Air conditioningA ducted unit or a set of split systemsWhere the outdoor unit sits, and whether the run goes through the roof space
Hot waterStorage, heat pump or instantaneousAn instantaneous unit draws far more and steps the cable up with it
Sub-mainsA shed, studio, granny flat or second boardDistance, and whether it is trenched, in conduit or run overhead
Solar and batteryInverter, isolators and the board connectionWhere the array sits on the roof relative to the switchboard
EV chargerA dedicated charging circuitCharger rating, run length, and whether the board has a spare way left
Residential circuit types on a Perth job. Commercial work adds mechanical services power, emergency and exit lighting, and the wiring that serves the fire system.

Voltage Drop Is What Makes A Long Run Expensive

A cable is not sized by the load on its own. AS/NZS 3008 sets how much voltage may be lost along the way, and past a certain length the cable steps up a size to stay inside it. On a deep block, a rural lot or a shed at the back fence, that step is often the difference between the quote you win and the one you wish you had checked.

Perth Is Double Brick, And That Changes The Labour

Most of the country frames its houses in timber. Perth builds in double brick, and an estimate carried over from an eastern-states job prices the wrong install.

On a masonry home the cable comes down from the roof space or gets chased into the brickwork, and the point on an external cavity wall costs more labour than the identical point on a stud wall. That difference does not appear anywhere in a rate per point.

Where The Extra Time Actually Goes

  • Chasing and making good in brickwork for switch and outlet drops
  • Conduit set into the cavity before the leaves go up, which has to be coordinated with the bricklayer
  • Roof-space runs on a low-pitch or tiled roof with limited crawl access
  • Slab-set conduits for island benches and floor outlets, which are a pre-pour item
  • Rewires in a finished ceiling, where one circuit can swallow a multiple of the new-build labour
  • Second-storey additions where the existing board and mains have to be reassessed
Double-brick cavity wall under construction in Perth showing the cavity and wall ties between the two leaves
Two leaves of brick and a cavity. Every point on that wall is a chase or a conduit run, not a staple to an open stud.

The Standards Behind The Numbers

Every quantity answers to your specification and to the standards the finished install has to satisfy. Where the drawing and the standard pull in different directions, that goes on the notes page as a query rather than being settled quietly by us.

StandardCoversWhy It Shows Up in the Estimate
AS/NZS 3000Electrical installations, the Wiring RulesThe core installation standard behind circuit and protection counts
AS/NZS 3008Selection of cables for installationsWhat size the cable has to be once voltage drop is allowed for on a long run
AS/NZS 3018Domestic installationsResidential-specific requirements on a new build or rewire
AS/NZS 4777Grid connection of inverter energy systemsSolar and battery work, which is standing scope on Perth housing
Network connection and metering requirements are coordinated with the local network operator and noted as their own line, not absorbed into a point rate.

Where Electrical Quotes Usually Go Wrong

One flat rate across every point, which buries run length and access. A cable length scaled straight across the page when the real pull goes up into the ceiling, along and back down again. A board upgrade left off a renovation, where it is usually the biggest number on the job. A sub-main to a shed or a granny flat forgotten because it is not a point at all. Data folded in with power, which makes the total look dearer than the quote sitting next to it.

Construction drawings spread on a desk with queries marked up during an estimate

Two Identical Plans, Two Very Different Bills

The floor plan tells you where the points go. The finishes and electrical specification tell you what they are, and that is the document that moves the money.

So both get read side by side, and a fitting named by brand keeps a line of its own. A later substitution then moves one figure instead of the whole sheet.

  • Fitting selection, where a named brand or a named series keeps its own line
  • Dimming and smart switching, which add hardware at the point and cable behind it
  • Cable type, where the spec calls up something other than standard building wire
  • How far the client wants circuits split, which sets how big the board has to be
  • Weatherproof and outdoor points, which are priced nothing like an internal double

Where the drawing and the specification disagree, we flag it in writing rather than quietly picking one.

Solar, Battery And EV Charging, Priced On Its Own

Solar is standing scope on Perth housing and it is almost never on the original electrical plan. It arrives as a line in the specification, or as a conversation the client has already had with somebody else.

So it is priced as its own package. The client can then take it, defer it or put it elsewhere without a single figure in the rest of your quote having to move.

  • Array position and panel count, taken off the roof plan and the aspect it faces
  • Inverter location, and the DC run from the array down to it
  • The AC run from the inverter back to the switchboard
  • Rooftop and inverter isolation, plus any change the board needs to accept the connection
  • Battery position, its own isolation, and the wall or slab it has to be mounted to
  • EV charger rating, its dedicated circuit, and whether the board has a spare way left

Why It Stays Off The Main Sheet

Network approval and metering for a grid connection sit with the local network operator and run on a timeline nobody on site controls. Folding that into the main electrical total makes your quote read dearer than the one beside it, and ties your price to a date that is not yours.

Commercial And Industrial Electrical

A fit-out, a warehouse or a factory is not a bigger house. Distribution is built around a main board and sub-boards, cable is carried on tray and ladder rather than clipped to framing, and a good part of the total sits in items a house does not have at all.

That work is priced the same way, off the drawings and the specification, with each package on its own sheet so a services subbie or a builder can read the part that belongs to them.

  • Main switchboard and every sub-board, scheduled by their contents
  • Cable tray, ladder and basket measured as their own lines
  • Emergency and exit lighting to the drawing and the schedule
  • Mechanical services power, priced against the mechanical drawings
  • Fire system interfaces and the wiring that has to serve them
  • Data, security and access control kept as separate packages
Cable ladder suspended on rod hangers beneath the roof of a Perth warehouse, carrying cable runs with high-bay light fittings mounted alongside
Tray, ladder and conduit are measured as their own lines. On a shed or a fit-out they are a real part of the total, not an offcut of the cable price.

What We Need, and What You Get Back

An electrical estimate needs less than most people send. The plan and the specification will start it, and if anything else is needed you hear about it the day the set arrives.

Point

Counted by type

Grouped room by room

m

Cable by real route

Measured, not scaled

AS 3000

Wiring Rules

Behind every circuit

24hr

Turnaround

Most residential jobs

What To Send

  • The electrical plan, at any scale, as a PDF
  • The specification or the electrical schedule if there is one
  • The architectural set, so ceiling heights and wall types are visible
  • Whether the job is a new build, a rewire or an addition
  • Any solar, battery or EV charging scope, even if it is not drawn yet
  • Your own supply or labour rates if you want them used

What Comes Back

  • A colour-coded markup with every counted symbol visible on the plan
  • A point schedule grouped by room and by type
  • A cable schedule by circuit, with size and route length
  • The switchboard listed device by device, with sub-mains on their own lines
  • Solar, battery, EV and data kept as separate packages
  • A written query list naming every assumption made

First Electrical Estimate Free

Send the electrical plan and the specification and tell us whether it is a new build, a rewire or an addition. You get the markup, the point and cable schedules and a priced spreadsheet back, usually inside 24 hours on a residential job. First one is on us.

Common Questions

Straight answers on how we price electrical estimating in Perth. If yours is not here, send your plans and just ask.

Both, on separate lines. The point count is the figure your client will hold up against the other quote on the table. The cable measure is the one that keeps you out of trouble when the runs are long. Every circuit shows its route, length, cable size and protective device, so there is no part of the total you cannot stand behind.

Yes. The board is written out by what actually goes in it: the main switch, every breaker and RCBO at its rating, surge protection, the metering arrangement and the enclosure size, plus any change to the consumer mains. On a renovation this is often the largest line on the job, so it gets its own page in the estimate rather than a single figure.

Yes, and we keep it as its own package. Panel and inverter positions, DC and AC run lengths, isolators and switchboard changes are listed separately so the client can accept or defer that part without the rest of the quote moving.

By reading the drawings and the scope for what the install has to get through. A finished ceiling with no roof access, a low-pitch tiled roof, or a double-brick wall that needs chasing all move the labour per point, so the access allowance is written on the estimate instead of being folded into a rate. Where the drawings are silent on it, it goes down as an assumption for you to confirm.

Most residential jobs come back inside 24 hours of us having a complete set of drawings. Commercial and industrial work usually runs two to three days, because the board schedules, the services coordination and the separate packages all take longer to build. If a set is missing something we need, we tell you on the day it arrives rather than at the end.

That is common on a renovation and on early-stage documentation. We price what is drawn, list what is missing as a query, and where a count has to be assumed we write the assumption on the estimate so you can confirm or correct it. Nothing gets silently invented to make the sheet look finished.

Yes. Electrical can sit inside a full multi-trade takeoff with concrete, brickwork, plastering and the rest, each trade on its own sheet with its own total rather than blended into one lump. Send us the full set and tell us which trades you want priced.